IPC Seal of Approval


Reading time ( words)

IPC_seal.jpgWhat if we could get the military, aerospace, medical, automotive, and a few other industry groups to agree to accept one site audit and one certification? In other words, one audit, once a year, which covers everything.

Already underway, IPC has ventured into the area of PCB fabricator and EMS provider audits based on IPC-1071 for fabricators and IPC J-STD-001 and IPC-A-610 for PCBA. Called IPC Validation Services, this effort is being driven by IPC’s OEM members who want to replace for individual site audits with a single IPC audit as the standard for vendor acceptance.

What Does Compliance Cost?

Randy Cherry is leading this effort at IPC. It’s a good first step but it doesn’t go far enough IMHO (my kids taught me that). We have an opportunity to remove a huge source of pain and suffering for many companies on both sides of the transaction. These site audits are time-consuming and expensive. After querying, I found one medium-sized EMS company’s costs of compliance, including audits, translated to about 0.5% of sales. I’m sure that with some economies of scale, that number would decrease, but it’s still a significant number for most companies and another non-value-added expense to doing business. EMS industry wide, that starts to add up. At about $500 billion in sales, the EMS industry’s cost of compliance is approximately $1 to 3 billion annually. If the same number holds for PCB fabs, then we’re looking at another $100 to 300 million. The industry spends a ton of money on this! Get this down to a single audit and the OEM wins, EMS/PCB fabs win, and if IPC does the job, they win as well. Seems like a no-brainer.  Here’s a list of likely target certifications which could be addressed with this effort:

  • ISO 9001 (Quality)
  • ISO 14001 (Environmental)
  • ISO/TS 16949 (Automotive)
  • ISO 13485 (Medical)
  • AS 9100 (Aerospace)
  • ANSI/ASQ Q9001
  • ANSI/ASQ Q9003
  • DSCC (Defense Supply Center Columbus) / DLA (Defense Logistics Agency)
  • NADCAP (list specifications and/or audit type)
  • UL
  • ITAR (Registered #)
  • OHS18001 (Occupational Health & Safety)
  • IRIS (International Railway Industry System)
  • MIL PRF 55110

I’m sure there are more we could add to this list and some that shouldn’t be on it. In any case, you get where I’m going with this.

Read the full column here.


Editor's Note: This column originally appeared in the November 2014 issue of SMT Magazine.

Share

Print


Suggested Items

Photonics Systems Looks to Expand Its PCB Capabilities

06/17/2019 | Barry Matties, I-Connect007
Pulsed-laser equipment manufacturer Photonics Systems looks to expand its capabilities to the PCB industry. Barry Matties sat down with Antonio Schmidt and Kurt Weber to talk about the company’s transition and the challenges they’ve faced thus far as they continue to build and extend their brand into a new market segment.

Quality by Design

06/14/2019 | Nolan Johnson, I-Connect007
The design team’s files and the accompanying documentation is the real-world implementation plan to turn the OEM’s concepts and marketing research into a viable, physical, competitive product. Unless manufacturing defies the build instructions from the designers, the product will only be as manufacturable as the design files themselves.

Orbotech Celebrates Success of Orbotech Diamond and Discusses Future Trends

05/31/2019 | Barry Matties, I-Connect007
At the recent CPCA Show in Shanghai, Orbotech celebrated having over 100 of their Orbotech Diamond™ direct imaging machines in the marketplace. Barry Matties caught up with Meny Gantz—VP of marketing for Orbotech’s PCB division—to talk about the drivers behind the success of Orbotech Diamond systems before turning the conversation toward the future and Industry 4.0.



Copyright © 2019 I-Connect007. All rights reserved.