All About Flex: Embracing the Mess


Reading time ( words)

Second, empower employees with decision-making responsibility. Obviously, all employees cannot be allowed to make all decisions, but a freedom scale does provide good guidance. This message and direction needs to be discussed as part of communicating the business plan. The various levels of decision-making freedom are:

  • Freedom Level 5: Act—routine reporting only
  • Freedom Level 4: Act, but advise at once
  • Freedom Level 3: Make recommendation and take resulting action
  • Freedom Level 2: Ask what to do
  • Freedom Level 1: Wait to be told

Different decisions will result in alternative levels of decision-making freedom, but good employees should be encouraged to operate at freedom level 3 at a minimum. With experience and demonstrated prowess, employees climb the ladder.

Third, support and celebrate. This is probably the most difficult. It is entirely possible that incorrect decisions will occur and culture can be crushed if reasonable decisions are second guessed with the benefit of hindsight. Empowerment cannot exist if aggressive decision making is negatively reinforced when early decisions prove inaccurate. For a culture of empowerment to be effective, management needs to support unexpected outcomes. The most important question is, “What was the available information when the decision was made?” Successes need to be sought out, communicated, and celebrated. This helps build a corporate culture that encourages rapid response. Trusting people to understand when they need additional time, or a supervisor’s concurrence, needs to be supported by both words and actions.

Fast-paced change is a fact of life and it’s not going to slow down. Empowerment helps decisions occur by those individuals closest to the problem. Decentralized decision-making helps ensure issues can be addressed promptly. It’s the blocking and tackling that usually wins the game, not the Hail Mary pass. In the printed circuit business world this means several things.  Turn quotes quickly. Have back-up staff in place when people are out of office. Don’t leave work with unanswered messages. Keep the ball in the customer’s court. Inform customers about the status of their project. Respond when there is a problem. Embrace the mess…it can be the key to survival. 

Dave Becker is vice president of sales and marketing at All Flex Flexible Circuits LLC.

 

Share




Suggested Items

EIPC Technical Snapshot: Novel Laser-based Manufacturing Processes in Automotive Electronics

09/22/2022 | Pete Starkey, I-Connect007
“Summer is over, now it's back to work!” This was the opening line of the invitation to the 18th EIPC Technical Snapshot webinar, Sept. 14, following the theme of advances in automotive electronics technology, introduced and moderated by EIPC President Alun Morgan. The first presentation, entitled "The fully printed smart component—combining additive manufacturing and sensor printing," came from Jonas Mertin, a thin-film processing specialist at the Fraunhofer Institute for Laser Technology.

EIPC Summer Conference 2022: Day 2 Review

06/29/2022 | Pete Starkey, I-Connect007
Örebro, Sweden on June 15 brought a bright and early start to Day 2 of the EIPC Summer Conference for those who had enjoyed the previous evening’s networking dinner, but had resisted the temptation to over-indulge or to carry on their long-awaited catch-up conversations with old friends into the small hours. All but a few were in their seats for 9 a.m., awake and attentive for Session 4 of the conference, on the theme of new process technologies, moderated by Martyn Gaudion, CEO of Polar Instruments.

Technica Heats Up ROI Discussion

05/17/2022 | I-Connect007 Editorial Team
The I-Connect007 Editorial Team speaks with Technica’s Frank Medina, Ed Carrigan, and Jason Perry about trending hotspots that provide the PCB fabricator a high return on investment (ROI). A theme that carries throughout the conversation is that traditional methods for calculating ROI are being replaced by models that include more qualitative factors.



Copyright © 2022 I-Connect007. All rights reserved.