Ventec Europe Continues Investment in FOD Elimination


Reading time ( words)

Back in July, I took the opportunity to check out recent developments at Ventec Europe’s UK Distribution Centre.

It was clear that continuing investment was being committed to the establishment and maintenance of meticulous cleanliness in the pre-preg handling areas. Mark Goodwin, Ventec’s chief operating officer for Europe and the United States, explained the strategy: “You are aware that we have always made every effort to ensure that the pre-preg we deliver is completely free from foreign object debris in the form of particulate contamination. Ventec Electronics have put enormous investment into establishing and managing a critically clean manufacturing process for prepregs and laminates, and monitoring production with advanced inspection technology. We are determined to maintain those cleanliness standards all the way into the customer’s lay-up room and our fabrication equipment and environment here in Ventec Europe have been specifically designed to aerospace standards. As you know, the European Space agency sees contamination of laminates by foreign material in the dielectric as a major problem, and is collaborating with key suppliers to mitigate the risk and seeking support from laminate manufacturers to define a new procurement specification in the form of Appendix A to IPC-4101-D.”

Here we are in December, with Goodwin proudly revealing the latest outcome of his continuous improvement programme: two immaculately presented clean rooms, one each for poyimide and epoxy pre-preg cutting and packing. “You can look through the windows, but only trained operators in full clean-room outfits are allowed in there!" said Goodwin. "See, above the Pasquato slitter-sheeters we have now installed HEPA-Lite certified ISO Class 7 canopies, so that each machine has a constant laminar down-flow of highly filtered air to give an ultra-clean operating environment with real-time monitoring of temperature and humidity.”

Goodwin explained the principles of operation: “We only work in full rolls of prepreg; once a roll is transferred from the cold store to a slitting machine, we slit the whole roll so that there is no backwards-and-forwards traffic of part-rolls. When a roll is loaded onto a machine, the outer material layer of prepreg is threaded through and discarded. Then we proceed to cut panels until the end-of roll detector stops the machine and we discard the tail-end of the roll to avoid adhesive transfer. Cut panels are removed from the machine in stacks and the top panel of each stack is inspected before packing. The pre-preg leaves the clean environment in sealed aluminised packs. Our labelling system is fully barcode- and human-readable, with full product-identity, lot-number, quantity and customer-reference details.”

“No card or wood is permitted in the pre-preg processing rooms, and you will notice that all the work-surfaces are stainless steel and that each room has its own set of dedicated handling equipment, colour coded to identify where it belongs and never leaving that area, to eliminate the risk of cross-contamination. Outside in the warehouse area we are actively working towards excluding dust, and are about to fit wheel cleaners at the entrance from the loading bay to prevent fork trucks carrying dust in from outside.”

“In September this year, we publicly declared our commitment to support the proposal led by the European Space Agency to define an enhanced quality standard for base materials used in high-reliability PCBs for critical applications, with particular reference to the prevention and detection of  foreign material inclusions early in the supply chain. Even though Appendix A to IPC-4101-D has yet to be formally adopted, we already have customers calling-up ESA requirements on their purchase orders. And if we use ESA as our default standard, then our whole customer base benefits as a result.”

Share




Suggested Items

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

11/11/2022 | Nolan Johnson, I-Connect007
The industry news cycle seems to be picking up speed lately. Of course, 30 days into the quarter is about when public companies announce their results, and in the midst of this worldwide financial situation, we’ve got all eyes on anything coming out from our counterparts in the industry. I’ve noticed that global corporate results (Nan Ya PCB and TTM, in particular) do seem to be on everyone’s radar. In addition to financial news, trade shows are popping back up around the world—Europe, India, and a special report from editor Andy Shaughnessy, who took his own road trip to Raleigh, reporting on PCB Carolina, which had its own heyday this year.

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

10/14/2022 | Nolan Johnson, I-Connect007
I’ve been in Washington, D.C., most of this week, attending and reporting on the IPC Advanced Packaging Symposium. You’ll see more content from me in the weeks and months to come as I sort through and highlight the varied aspects of this ground-breaking event. If you’re in this industry, advanced packaging will affect you, make no mistake about it.

Michael Carano: A Focus on Process Control, Part 2

09/28/2022 | I-Connect007 Editorial Team
In this second half of our conversation, Michael Carano discusses some of the metrics that fabricators need to consider before investing in new processes, especially process control technologies, and some of the challenges board shops face updating brownfield sites.



Copyright © 2022 I-Connect007 | IPC Publishing Group Inc. All rights reserved.