Driving Down Cost with Process Engineering


Reading time ( words)

Nolan Johnson and Barry Matties speak with Matt Mack, a process engineer at ICM Controls. Matt shares how he’s driving down cost through continuous improvement. He also discusses planning for the future with automation and AI. Matt started with ICM Controls in 2019. Prior, he worked at Whelen Engineering (now GreenSource Fabrication) for about five years. His career in the PCB industry began at Sanmina.

Nolan Johnson: We’re interested in learning about your approach to process engineering. What’s your thinking for identifying processes that are in need of improvement?

Matt Mack: I start with our price per panels and the costs that are associated with it. I start to think, how can we make the process smoother, more efficient, where I don’t need to have as much human interaction with chemicals? That all starts with gathering data with chemical data. I’ll do titrations, for example. I’ll pick one line at a time that I will not have any dosing on, and I’ll calculate the square footage of panels through X amount of time, how much it dropped in concentration, and I’ll adjust dosing based on panel count. Then you have to optimize speed.

You can also do line speed, increasing or decreasing to optimize quality. I always strive for the 1.33 Cpk for the parts. It’s not always possible, but we come pretty close. It took about six months to really get dosing right. Right now, we do chemical analysis about twice a week. That’s much lower than recommended, but the data is not driving us to analyze it more. I asked our software guy to develop a chemical database that allows me to input the chemical data and track Cpk, track trends up and down, and in-spec/out-of-spec; if any of those rules are violated, it notifies me through an email.

Some of those are deemed critical, some are not. If any of it is deemed critical, we’ll trigger the production’s halt. If it’s not critical, we might be able to do it on the fly. For instance, let’s look at the copper concentration in a microetch. I might empty the line out before its formal dump, but it’s not going to impact quality on the product. Those are some of the rules that I observe. Any time you see a trend of five points decreasing, it could be a dosing issue, so I would jump right on the dosing, and verify it’s dosing what I’ve asked it to dose; second, maybe the chemical ran out and there’s an airlock. I get a lot of those emails where it’ll show you process control.

Matties: When you stand back as a process engineer and take that 30,000-foot view of a process, what do you want to improve to optimize it? What’s your process for doing that?

Mack: The first thing I monitor is speed. We track panels through and panels out. I would always start with asking: What are some of the slower ones, and how do I increase throughput on that piece of production? If you’re going to have funnels where, let’s say, the score machine is not putting out as many panels as the plating line, I might need to buy either a faster score machine or an additional score machine to maximize output. As we’re ramping up here, there is some capex equipment that we’re looking to quote in order to increase production on the floor. Generally, speed is what I look at.

The second thing would be chemical usage. If it costs us X to run one panel, what is the impact of that one piece of chemical on the panel? I look at price per panel by operation, as well. Can I get away with dosing less? For instance, for the pre-treat line, they recommended running something like 20 milliliters a panel. I actually optimized it to only run at about 8 milliliters. It saved us $18,000 over the course of a year. A lot of what drives me to look at process either optimizes panel production or price. Regarding price, for example, every six months I’ll review price per panel to determine where we can improve and where we can’t.

To read this entire interview, which appeared in the April 2021 issue of PCB007 Magazine, click here.

Share




Suggested Items

Plating on Silver: What’s Old is New Again

07/07/2022 | Denis Jacques, Technic Inc.
About three decades ago, immersion silver, a nitrate-based process, gained a lot of market share in the world of PCB final finishes. More economical than ENIG, flat, solderable, and conductive, it had everything going for it—everything but corrosion resistance in a harsh environment, that is. Champagne voids were also an issue, along with line reduction. But the worst drawback, the characteristic that made the part short over time, was creep corrosion. A build-up of copper sulfide salt that grows in contact with a sulfur-rich environment, heat, and moisture resulted in failures in the field. This was enough to scar the process for good.

EIPC Summer Conference 2022: Day 2 Review

06/29/2022 | Pete Starkey, I-Connect007
Örebro, Sweden on June 15 brought a bright and early start to Day 2 of the EIPC Summer Conference for those who had enjoyed the previous evening’s networking dinner, but had resisted the temptation to over-indulge or to carry on their long-awaited catch-up conversations with old friends into the small hours. All but a few were in their seats for 9 a.m., awake and attentive for Session 4 of the conference, on the theme of new process technologies, moderated by Martyn Gaudion, CEO of Polar Instruments.

EIPC Summer Conference 2022: Day 1 Review

06/28/2022 | Pete Starkey, I-Connect007
At last, a live EIPC conference and this time in the Swedish city of Örebro, “where history and contemporary culture converge,” a pleasant and convenient location for an event that included a privileged visit to the Ericsson facility in Kumla. Around 100 delegates made the journey and the Örebro Scandic Grand Hotel was an excellent conference venue for the June 14-15 conference.



Copyright © 2022 I-Connect007. All rights reserved.