-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueThe Growing Industry
In this issue of PCB007 Magazine, we talk with leading economic experts, advocacy specialists in Washington, D.C., and PCB company leadership to get a well-rounded picture of what’s happening in the industry today. Don’t miss it.
The Sustainability Issue
Sustainability is one of the most widely used terms in business today, especially for electronics and manufacturing but what does it mean to you? We explore the environmental, business, and economic impacts.
The Fabricator’s Guide to IPC APEX EXPO
This issue previews many of the important events taking place at this year's show and highlights some changes and opportunities. So, buckle up. We are counting down to IPC APEX EXPO 2024.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - pcb007 Magazine
Boeing Receives $1.5 Billion P-8A Poseidon Contract From U.S. Navy
March 31, 2020 | BoeingEstimated reading time: 1 minute
The U.S. Navy awarded Boeing a $1.5 billion production contract for the next 18 P-8A Poseidon aircraft. The contract includes eight aircraft for the U.S. Navy, six aircraft for the Republic of Korea Navy and four aircraft for the Royal New Zealand Air Force.
The Republic of Korea Navy and Royal New Zealand Air Force acquired the aircraft through the Foreign Military Sales process and will receive the same P-8A Poseidon variant designed and produced for the U.S. Navy. The Royal New Zealand Air Force is expected to begin receiving aircraft in 2022 and the Republic of Korea Navy is expected to begin receiving aircraft in 2023.
The P-8 is a proven long-range multi-mission maritime patrol aircraft capable of broad-area, maritime and littoral operations. A military derivative of the Boeing 737 Next-Generation airplane, the P-8 combines superior performance and reliability with an advanced mission system that ensures maximum interoperability in the battle space.
The P-8 is militarized with maritime weapons, a modern open mission system architecture and commercial-like support for affordability. The aircraft is modified to include a bomb bay and pylons for weapons. It has two weapons stations on each wing and can carry 129 sonobuoys. The aircraft is also fitted with an in-flight refueling system.
With more than 254,000 flight hours to date, the P-8A Poseidon and P-8I variants patrol the globe performing anti-submarine and anti-surface warfare; intelligence, surveillance and reconnaissance; humanitarian; and search and rescue missions.
Suggested Items
Saab Announces Plans for New Munitions Facility in U.S.
04/03/2024 | SaabSaab announced plans to build a new munitions facility in the U.S., continuing the company’s strong investment and growth domestically.
Arlon EMC Receives IPC-4101 QPL Recertification
03/20/2024 | Arlon Electronic MaterialsArlon Electronic Materials has successfully completed an intensive two-day recertification audit by IPC Validation Services that examined Arlon’s manufacturing processes and testing procedures to assure that they are in conformance to the requirements of IPC-4101E-WAM1, the Specification for Base Materials for Rigid and Multilayer Printed Boards.
Orbit International Electronics Group Reports Bookings for February 2024 in Excess of $2,000,000
03/14/2024 | Globe NewswireOrbit International Corp., an electronics manufacturer and software solution provider, announced that its Electronics Group (OEG) reported bookings for the month of February 2024 in excess of $2,000,000.
U.S. Space Force Awards Boeing WGS-12 Communications Satellite Production Contract
03/07/2024 | BoeingBoeing received a $439.6 million contract to build the 12th Wideband Global SATCOM (WGS) communications satellite for U.S. Space Force's Space Systems Command.
IPC Releases Newest List of Standards Updates, Revisions
02/20/2024 | IPCEach quarter, IPC releases a list of standards that are new or have been updated. To view a complete list of newly published standards and standards revisions, translations, proposed standards for ballot, final drafts for industry review, working drafts, and project approvals, visit ipc.org/status.