- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueThe Growing Industry
In this issue of PCB007 Magazine, we talk with leading economic experts, advocacy specialists in Washington, D.C., and PCB company leadership to get a well-rounded picture of what’s happening in the industry today. Don’t miss it.
The Sustainability Issue
Sustainability is one of the most widely used terms in business today, especially for electronics and manufacturing but what does it mean to you? We explore the environmental, business, and economic impacts.
The Fabricator’s Guide to IPC APEX EXPO
This issue previews many of the important events taking place at this year's show and highlights some changes and opportunities. So, buckle up. We are counting down to IPC APEX EXPO 2024.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - pcb007 Magazine
Book Excerpt: The Electronics Industry’s Guide to… The Evolving PCB NPI Process, Chapter 1
September 28, 2022 | I-Connect007 Editorial TeamEstimated reading time: 2 minutes
Chapter 1
How the NPI Process Has Changed and Where We're Going
When forging into unknown territory or exploring new ground, it can help to look at where we’ve been so we can orient ourselves.
Just a few decades ago, electronics manufacturing companies were producing high volumes of few products. The efficiency of electronics manufacturing lines is measured by overall equipment effectiveness (OEE) and total effective equipment performance (TEEP). Back then, this meant optimizing the time it took to build a single board. If the time it took to build one board could be reduced by a few seconds, the savings would be multiplied by the number of boards being built. This could be in the hundreds of thousands or millions of boards, with no changes in the line configuration. If it took a day to change over from one product to another, it didn’t matter because the TEEP/OEE was driven by the time it took to build a board.
For example, consider that it takes 35 seconds to place components on a single board, and I need to make 250 boards. My handling time (the time it takes to load a board into the machine and get it out after) is 10 seconds, then the total time to build the 250 boards will be (35 + 10) • 250 = 11,250 seconds. This equates to about 188 minutes, or approximately three hours. If it takes four hours to changeover—namely reconfigure the line before starting a different PCB—to a new product, my OEE will be less than 50%, considering no other external factors. As the batch size goes down, the changeover time dominates the OEE figure.
In today’s high-mix, low-volume production environments, performance is further enhanced with line efficiency. Line efficiency is the ratio of the number of hours during which a high-volume, pick-and-place machine places parts on the PCB, divided by the number of hours during which the SMT assembly lines are staffed (placement time/staffed time x 100). It is a solid number, simple to obtain, and has great value as a key performance indicator.
With higher product mixes, the number of NPIs being processed increases. Changeovers on the shop-floor line can happen daily or many times a day. This also means the time it takes to process the source design data has increased. This data-processing time is becoming a more important consideration compared to when NPI processing was not a daily task in the lower mix environment. As product mix has gone up, there has been a move from mixed vendor lines focused on ultimate through-put to single vendor lines focused on flexibility and shorter changeovers. There may be more than one pick-and-place vendor brand in the factory, but each line commonly has only one brand now.
Download your free copy today! You can also view other titles in our full library.
We hope you enjoy The Electronics Industry’s Guide to… The Evolving PCB NPI Process.
Suggested Items
Sypris Receives New Releases Under Electronic Warfare Program
05/03/2024 | Sypris Electronics LLCSypris Electronics, LLC, a subsidiary of Sypris Solutions, Inc., announced that it has recently received additional releases under a multi-year production contract that was first announced in 2022. The order, which provides for Sypris to begin deliveries in 2024, calls for the manufacture and test of electronic assemblies for an additional four systems to be supplied to a U.S. DOD contractor.
Gstar Announced the Strategic Move: Groundbreaking of Silicon Wafer Factory Construction in Indonesia
05/03/2024 | PRNewswireRecently, Gstar held a groundbreaking ceremony for its silicon rod and silicon wafer factory, marking the beginning of the rapid construction phase.
LQDX Divests Aluminum Soldering Business - Mina™ - to Taiyo America Inc.
05/02/2024 | PRNewswireLQDX, formerly known as Averatek Corp., developer of high-performance materials for advanced semiconductor manufacturing, today announced that it has divested its aluminum soldering business – known as MinaTM – to Taiyo America Inc., a global market leader in advanced electronic materials.
GPV’s Q1 2024 Interim Financial Report Shows Strong Navigation in Uncertain Times
05/01/2024 | GPVDanish-based GPV recorded an expected drop in sales to DKK 2.3 billion for the first quarter of 2024. The decline also affected the operating profit, which was DKK 155 million compared to DKK 179 million in the same quarter last year, although the EBITDA margin was maintained. In general, demand has been softer in 2024, but GPV continues to invest for the long-term and expects the trend to turn in the second half of 2024.
Europlacer Presents New Range of iineo SMT Placement Machines.
05/01/2024 | EuroplacerFor more than 15 years, the Europlacer iineo placement machines have made their mark on the SMT industry with unique features and unrivalled flexibility. Today, Europlacer announces the launch of the second generation iineo.